CORPORATE
OWNER'S ENGINEERING
- Highlighting potential risks associated with the project and providing appropriate mitigatory techniques.
- Identifying technical constraints at the initial stages of the project.
- Estimating the maximum production potential of the plant.
- Evaluating optimized Technologies for the project.
- Supporting client in taking informed decisions
DUE DILIGENCE SERVICES
- P50, P75, P90 and P99 Production Forecasts.
- Energy Production Analysis and PR (Performance Ratio) checks.
- Solar Power Plant Cash Flow Diagrams.
- Project risk analysis.
- Financial modeling.
- Project Design.
MANUFACTURING PROCESS CONTROL
- BOM List Conformity Check, Certification Verification
- Electroluminescence Imaging- Crack, micro crack etc. Visual Check of PV Modules
- Flash Test Reports Check and Peak Power Checks
- Panel electrical specifications checks
- Performing and visual checks of PV Modulation equipment
- Determination of Calibration Conformity
- Inspection and control of ITP and tests of PV Panels.
- Dimensions and materiality eligibility determination
- Quality System inspection
PRE-LOADING TRANSPORT STORAGE CONTROL -TRANSPORT SURVEILLANCE OF MODULE PACKAGING UNITS
- Pallet Conformity check
- Packaging Specs Compliance check
- Accompanying Power Measurement and EL Tests
- Storage suitability determination of the stored raw material and the PV Modules whose production have been completed
- Conformity determination in upload and download stages, Transport vehicles conformity check
- Performing label checks of packaged products and making conformity checks according to the order list.
CONSTRUCTION SURVEILLANCE SCOPES
- Checking the suitability of the existing site with the approved projects.
- Checking the conformity of the construction and panel assembly according to the existing construction contract.
- Control of site layout with approved projects.
- Checking whether the materials are of sufficient quality.
- Controlling the conformity of materials to the contract and standards.
- Indication of technical risks.
- Indication of all the deficiencies in the facility and the cost figures required for the elimination of these deficiencies.
- Panel connections and mechanical system connection points control.
SPP VERIFICATION AND INSPECTION
- Design Verification,
- Installed Power Detection and Verification,
- Thermographic Inspection,
- IV Curve Measurement,
- Installation and assembly inspection,
- EL Tests of PV Panels (in site)
- Insulation Tests,
ENERGY PRODUCTION ANALYSIS
Investors and project developers return their investments guarantee return and make investment decisions independent knowledge on expected energy return for they need to take. RAMIRA impartially presents the production analysis of the power plant to the investor. We offer Due Diligence service our customers.
FIRST YEAR PERFORMANCE RATIO (PR) VERIFICATION TESTS
As the facility goes into production, the system's overall efficiency and production are calculated by processing production data and radiation and temperature data twice a year. Realized values are analyzed with the PVsyst program, PR validation is checked and verification is made. In the subsequent controls, this data is compared with the panel degradation, and the simulation is made and presented to the investor.
ENERGY ANALYSIS
- Degradation Analysis
- Thermographic Inspection
- IV Curve Measurement
- EL Tests of PV Panels (in site)
- Insulation Tests